ANONYMIZED PROCUREMENT RECORD

Industrial UAV Battery Procurement: From Requirements Review to Samples

An anonymized procurement record covering battery requirements, documents, customer-supplied accessories and joint engineering evaluation before production supply.

Article updated 2026-11-03

Published by CELL & PACK

Current stage: samples sent

CELL & PACK organized an industrial UAV battery request around four connected decisions: performance targets, product evidence, accessory scope and sample evaluation. The buyer, an industrial UAV manufacturer, sought a battery pack using a semi-solid electrolyte system to meet endurance, high-load, space and operating requirements.

Recorded project stage: samples sent. Engineers from both sides are responsible for testing and compatibility confirmation. Their evaluation of the product and operating conditions establishes the basis for subsequent production-volume cell supply or coordinated pack production.

The buyer's initial requirements

The buyer defined the following selection targets and review items:

Scroll horizontally to read every column.

ItemBuyer target or information to check
Cell specific energyA cell-level selection target of at least 400 Wh/kg to support endurance requirements
High discharge loadsA requirement for at least 10C continuous discharge and higher peak loads, with the applicable conditions to be checked
Dimensions and massWhether the battery pack's dimensions and mass meet the installation requirements
Low-temperature useProduct information and conditions relevant to a discharge requirement at −20°C
Safety and transport documentsSafety-test information and UN 38.3-related documents corresponding to the candidate product

These are the buyer’s selection targets. The review separates cell-level figures from complete-pack requirements and links each candidate’s evidence to the relevant test conditions.

Reviewing specifications, documents and supply arrangements

We reviewed the supplier's specification sheets and relevant test information, comparing the stated specific energy, discharge rates and internal resistance. The document review covered UN 38.3-related information, safety data sheets (SDS/MSDS), IEC 62133-related information and nail-penetration or puncture test reports.

We checked which candidate each document identified, the tested object and conditions, and the relationship between the results and the project’s requirements. This organized the documents around the purchasing decision.

Supply discussions linked sample arrangements with the subsequent production stage, covering the route to either volume cell supply or coordinated pack production.

Customer-supplied accessories fit within the procurement scope

The customer can provide accessories for this project. We define accessory sourcing and the battery supply scope together, allowing the buyer to use its planned components.

The planned compatibility review covers the complete intended combination: pack dimensions, interfaces, BMS protocol and flight-control requirements. It will identify who supplies each accessory and how the combination will be evaluated.

Engineers from both sides lead sample evaluation

Engineers from both sides are responsible for testing and compatibility confirmation. The planned sample evaluation includes capacity testing using 0.2C charge and discharge, internal resistance checks, and a review of module voltage differences after a two-hour rest.

Evaluation records should retain measurement conditions and acceptance criteria. Engineers from both sides will use them to confirm compatibility and operating conditions, then define the supply basis.

From sample dispatch to the next supply decision

At the recorded sample-sent stage, the procurement sequence is:

Requirements and document review → samples → joint engineering testing and confirmation of compatibility and operating conditions → production-volume cell supply or battery pack production.

Once suitability and operating conditions are confirmed, the agreed scope determines the next route: production-volume cell supply for cell orders, or coordination of pack production for battery-pack orders.

Preparing a similar request

Start with the voltage and energy targets, continuous and peak loads, installation envelope, mass limits, temperature conditions and planned customer-supplied accessories. Provide the known requirements and leave open items for the document and sample review.

Use the Battery Sourcing Brief to organize your requirements, or discuss a battery procurement request.

Related reading

Compare cell specifications

Compare the attached conditions as well as the numbers. Technical suitability and current supply terms are confirmed for the project.